Bioenergiedorf Emmingen

Bioenergy village Emmingen: a further solarcomplex heat distribution network was constructed in Emmingen in 2013 (Tuttlingen). The project is different to heat distribution networks up until now. Firstly, the waste heat from two biogas plants is directed into the network. The combined heat and power is around 60 % and a larger energy storage system with a capacity of around 1,000 cubic meters is used to optimise the use of the waste heat from CHPs.